Search results for "Experimental pilot plant ASM1-SMP Calibration protocol Fouling MBR modelling Start-up"
showing 1 items of 1 documents
comparing two start-up strategies for MBRs: experimental study and mathematical modelling
2012
Abstract The performance of a membrane bioreactor (MBR), and mechanisms of fouling formation, may differ due to the start-up. Therefore, the start-up can constitute an aspect that critically influences MBR performance during its lifespan. Indeed, the start-up can influence the mechanisms of membrane fouling, which is of paramount importance in an MBR. In order to gain insights on the effects of the start-up, both experimental and mathematical modelling studies were carried out on an MBR pilot plant. The MBR pilot plant constituted of a hollow fibre membrane module, in a submerged configuration, was fed by real wastewater. Two experimental periods were carried out, lasting 65 days each, char…